Before the Production Test proper commences the wells need to be "cleaned up".
This involves producing out the fluids introduced during the Frac stage.
As stated in Calima's news release introduced fluids are gradually replaced with virgin well bore fluids and only then can meaningful production rates be calculated. This clean up period is time variable and can possibly involve nitrogen lift via coil tubing if required.
- Forums
- ASX - By Stock
- Ann: Reservoir Stimulation Operations Commenced
Before the Production Test proper commences the wells need to be...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CE1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.001(12.5%) |
Mkt cap ! $5.700M |
Open | High | Low | Value | Volume |
0.8¢ | 1.0¢ | 0.8¢ | $100.8K | 10.85M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 772763 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 2713985 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 772763 | 0.009 |
10 | 14622624 | 0.008 |
13 | 23827142 | 0.007 |
6 | 960000 | 0.006 |
11 | 4212000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 2713985 | 7 |
0.011 | 1250000 | 1 |
0.012 | 3500000 | 1 |
0.015 | 130000 | 2 |
0.016 | 50000 | 1 |
Last trade - 16.10pm 01/07/2024 (20 minute delay) ? |
Featured News
CE1 (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online