CE1 0.00% 0.9¢ calima energy limited

Ann: Reservoir Stimulation Operations Commenced, page-9

  1. 11 Posts.
    lightbulb Created with Sketch. 1
    The Well Completions have been run successfully and the Hydraulic Fraccing of each well is about to begin.
    The Well Clean Up phase will be the first stage of the Production Testing.
 
watchlist Created with Sketch. Add CE1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.