You may be right, but seems a strange excuse for a country that is suppose to be gagging to get $$$ and jobs for its people, to be still pissing about with such calcs.
In the meantime the timelines for the project has been completely flushed down the toilet.
Where is the ball mill order?? Thats a 15 - 24 month lead time item, never mind getting it on site.
Currently they have bought a crane. woohoo lol
2025 production if they are lucky at this pace.
Nothing achieved in 11 months.
Tell a lie, free shares to the BOD was ticked off lol.