LKE 11.9% 4.7¢ lake resources n.l.

Ann: Resource Connect Asia Future Facing Commodities Presentation, page-183

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 4,569 Posts.
    lightbulb Created with Sketch. 3168
    Yes this has been my experience.

    "The nature of this staged and sequenced construction is likely to allow various "teams" involved in work streams to perform in parallel to overlap the construction of the stages and shorten the overall construction time for the 50kTpa plant."

    9 sites, 15 gas compression trains, 2 Pipeline Compression facilities, probably my biggest project (was at all 9 sites at different stages), simultaneous but staged build- construction overlap - as areas in stage 1 are completed, they move on to those areas on stage 2/3/4/5. So there is no break in continuity, no multiple mobilization/demobilization events, no multiple ramp up/ramp down in all things project related - rather a great big S-Curve that covers the full project with baby s-curves for each train.
 
watchlist Created with Sketch. Add LKE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.