"how many pumps will be needed and how will they be powering said pump’s"
Exactly. The fact they still haven't done this work is shocking at best, negligent at worst.
Number of pumps required is based on the following variables
1) Plant capacity (ie 50ktpa)
2) Brine grade
3) process efficiency (ie recovery rate)
4) brine flow rate (ie pump rate)
From that you can calculate number of pumps. Bommer ballparked this at 60+GL per annum of brine, which based on a pump rate of 20L/s will require circa 100 pumps to extract the brine, and a further 100 pumps for reinjection.
- Forums
- ASX - By Stock
- LKE
- Ann: Resource Connect Asia Future Facing Commodities Presentation
Ann: Resource Connect Asia Future Facing Commodities Presentation, page-20
-
- There are more pages in this discussion • 179 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.0¢ |
Change
-0.001(1.64%) |
Mkt cap ! $104.2M |
Open | High | Low | Value | Volume |
6.1¢ | 6.2¢ | 5.7¢ | $463.0K | 7.772M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 68474 | 5.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.0¢ | 313567 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 68474 | 0.059 |
3 | 2589680 | 0.058 |
3 | 300000 | 0.057 |
12 | 227312 | 0.056 |
12 | 722907 | 0.055 |
Price($) | Vol. | No. |
---|---|---|
0.060 | 35784 | 2 |
0.061 | 163934 | 1 |
0.062 | 288792 | 5 |
0.063 | 368373 | 2 |
0.064 | 546877 | 3 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |