The cynic in u needs to be thrown out the window.
Do u honestly believe auz can drill sufficient holes, prep the samples, get them to the lab, wait for the assays, calculate the additional resources tonnes and include those facts in the BFS which is due to be completed by late July. In just 5 weeks time.
Mate, you're dreaming....
- Forums
- ASX - By Stock
- Ann: Resource expansion drilling commenced at Sconi Project
The cynic in u needs to be thrown out the window. Do u honestly...
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
-0.001(11.1%) |
Mkt cap ! $11.18M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.8¢ | $19.64K | 2.424M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 7471772 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 6569228 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 5471772 | 0.008 |
19 | 7806427 | 0.007 |
10 | 3180225 | 0.006 |
12 | 5436666 | 0.005 |
3 | 2300000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 6569228 | 18 |
0.010 | 10623477 | 31 |
0.011 | 6586813 | 17 |
0.012 | 6557458 | 13 |
0.013 | 2625750 | 7 |
Last trade - 16.10pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
0.9¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.8¢ | 0.9¢ | 0.8¢ | 50000 | ||
Last updated 15.59pm 14/06/2024 ? |
Featured News
AUZ (ASX) Chart |