AUZ 12.5% 0.7¢ australian mines limited

Ann: Resource extension drilling commences at Flemington Project, page-58

  1. 13 Posts.
    lightbulb Created with Sketch. 2
    Expected drill depth is ~30m and your costs per meter are way too high for a AC (Air core) rig, but interestingly your $1m budget about right.
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
-0.001(12.5%)
Mkt cap ! $9.79M
Open High Low Value Volume
0.7¢ 0.7¢ 0.7¢ $4.862K 694.5K

Buyers (Bids)

No. Vol. Price($)
39 11034814 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 1043722 14
View Market Depth
Last trade - 14.42pm 28/06/2024 (20 minute delay) ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.