That is true. If they can hit those targets then confidence will well and truly return. If you look at it from a mathematical perspective.
Challenger mill can potentially process 800,000 tpa. Although, its probably closer to 700,000 tpa.
800,000/12 = 66,666.66 tonnes per a month.
9317 oz x 32 = 298144 grams of gold
298144 g / 66,666.66 t = 4.47 g/t (at 100% recovery). That is some really high grade gold, they would need to process.
Add to My Watchlist
What is My Watchlist?