A question for those that are more knowledgeable on O&G drilling.
is it not possible to drill a new hole from the base of the current drill pad that sidetracks from the base to sufficiently re test the 200 horizon? This would save mobilisation costs on the rig and removing the issue of the concrete Footing required if the moved the pad 100 m closer to the pay zone?
I believe Scott might have briefly mentioned something on this on the JRI interview but it wasn’t expanded on, also I could have totally misinterpreted what was said
- Forums
- ASX - By Stock
- Ann: Response to ASX Price and Volume Query
A question for those that are more knowledgeable on O&G...
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.9¢ |
Change
0.001(1.47%) |
Mkt cap ! $97.83M |
Open | High | Low | Value | Volume |
6.8¢ | 6.9¢ | 6.8¢ | $30.72K | 447.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 722703 | 6.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 67016 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 722703 | 0.068 |
8 | 454283 | 0.067 |
8 | 347109 | 0.066 |
6 | 264237 | 0.065 |
3 | 448890 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 67016 | 2 |
0.070 | 62944 | 3 |
0.072 | 6453 | 1 |
0.073 | 100000 | 1 |
0.074 | 305018 | 2 |
Last trade - 16.10pm 27/05/2024 (20 minute delay) ? |
|
|||||
Last
6.8¢ |
  |
Change
0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
6.8¢ | 6.9¢ | 6.8¢ | 878791 | ||
Last updated 15.32pm 27/05/2024 ? |
Featured News
IVZ (ASX) Chart |