Also from 31 October:
"However, the design grade feed operation in October 2022 has shown that improved performance within the flotation circuit to match performance achieved in laboratory tests is needed to ramp up our production to targeted levels."
The above is a gross understatement from Len.
They produced 502T in the month when they should be producing 6666T.
Admittedly they only pushed just under 20000T of feed through the plant but the feed to SOP was 40:1.
I don't know the feasibility ratio for Kalium (can't find a figure) but peer projects have indicated a ratio of approx 10:1 mixed salts:SOP.
It's fair to suggest that EBTEC need to improve the plant performance by 300% (of 31 October level). It's a good job they are confident.