AKE 0.00% $9.83 allkem limited

Ann: Response to ASX Query, page-12

  1. 4,199 Posts.
    lightbulb Created with Sketch. 786
    Not much point. Apart from the cost (and carbon emissions), the ponds are designed to provide sufficient brine to match the processing capacity of the plant. Increasing the amount of concentrated brine produced from the ponds would not increase output unless there was a corresponding upgrade to the processing plant.

    (This assumes that the pond rebalancing results in the ponds working to design capacity).
 
watchlist Created with Sketch. Add AKE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.