Not much point. Apart from the cost (and carbon emissions), the ponds are designed to provide sufficient brine to match the processing capacity of the plant. Increasing the amount of concentrated brine produced from the ponds would not increase output unless there was a corresponding upgrade to the processing plant.
(This assumes that the pond rebalancing results in the ponds working to design capacity).
ORE Price at posting:
$3.44 Sentiment: Buy Disclosure: Held