Sorry i meant the 4E call that happened a month or so ago.
Good point about Karls 90 day notice. For sure he will be gone in 90s days and im assuming all contractors will be in same boat if not needed. MY understanding is that LVT is using some contractors in Phillipines for back end stuff so i dont think they will be gone since they will be on minimal wages.
- Forums
- ASX - By Stock
- Ann: Restructure and Cost Reduction Program to Achieve Cashflow
Sorry i meant the 4E call that happened a month or so ago. Good...
-
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LVT (ASX) to my watchlist
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.474M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LVT (ASX) Chart |
Day chart unavailable