Antipa are certainly not hanging around, and they might want to start generating cashflow as soon as possible
If we got a good deal from NCM, toll processing at Telfer could be a very attractive option for both parties, no headaches about recruiting staff, constructing a plant out there seems a demanding project
GGP were projecting about $7 per tonne for transport / haulage and $20 per tonne for processing in their PFS
Transport looks a bit low with the price of fuel and there will be other costs as well of course
So after we get the MRE update sometime in April, what comes afterwards?
Can any knowledgeable person sketch out an indicative roadmap / timeframe assuming that we were going for the toll processing route?
- Forums
- ASX - By Stock
- AZY
- Ann: Results Confirm High-Grade Gold-Copper at Depth at Minyari
Ann: Results Confirm High-Grade Gold-Copper at Depth at Minyari, page-15
-
-
- There are more pages in this discussion • 99 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZY (ASX) to my watchlist
|
|||||
Last
1.1¢ |
Change
-0.001(8.33%) |
Mkt cap ! $51.81M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.1¢ | $87.49K | 7.534M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
36 | 20884956 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 11814202 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
36 | 20884956 | 0.011 |
54 | 20852853 | 0.010 |
33 | 13809155 | 0.009 |
18 | 8352820 | 0.008 |
4 | 2250000 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 11814202 | 13 |
0.013 | 11067216 | 8 |
0.014 | 7141789 | 10 |
0.015 | 4568929 | 9 |
0.016 | 4415631 | 10 |
Last trade - 16.10pm 15/07/2024 (20 minute delay) ? |
Featured News
AZY (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online