    KB 150 is the first hole - drilled to 288m - thats 13% of the first drill programme of 2,300m. And its 0.2% of the agreed 3 year programme of a minimum of 150,000m.

    There are a lot more holes to be drilled yet! At this depth about 499 more! Its amazing to think that this drilling programme will require a hole of this depth every two days for the 3 years to total 150,000m!

    Does anyone have a good estimate of the cost of this drilling?

    "SPM will enter into a 50/50 Joint Venture with Wanguo in respect of the Regional Project should Wanguo:
    - successfully reach an additional JORC Measured Resource of 20 million tonnes at a minimum average grade of greater than 1% copper or greater than 10% zinc plus lead; or
    - complete a minimum of 150,000 metres of exploration drilling"
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.