The IRR previously based on sylvinite only production of MOP $450-$500 was calculated at around 15%. This was because of a large strip ratio and only a few metres of sylvinite at around 50 metres. With the whole resource being used and a depth starting from around 16 metres, I can't wait to see these new ball park figures for SOP $700
Add to My Watchlist
What is My Watchlist?