E25 2.44% 20.0¢ element 25 limited

Ann: Revised Shipping Strategy Yields Substantial Cost Reduction, page-132

  1. 2,688 Posts.
    lightbulb Created with Sketch. 546

    What they should do as well is to replace the Diesel Generators with Gas ones. Possibly part of the Stage 2 project, connecting the pipeline, etc.

    Should be at least 50% the cost per $/kWh, if not more. Possibly saving ~$1M per year at current Stage prod level.




 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.