Agree it will most likely lead to another leg down. Price has halved since the cap raise of $35M at $2.20. Proceeds will be used to fund the stage two expansion of manganese concentrate production from Butcherbird. Funds will also allow Element 25 to put a dedicated team in place to accelerate the flowsheet and plant design work to produce lithium-ion battery-grade manganese sulphate from the concentrate produced at the project. Perhaps a better description of the use of proceeds would have been " Funds will be used to cash flow operation until nameplate capacity is reached on Stage 1 " . JB needs to be very transparent with the market from this point on and not make any promises he can't fulfill - under promise and over deliver would be the right strategy at this point in time but not sure if it's in his nature to take this path.
- Forums
- ASX - By Stock
- E25
- Ann: Revised Shipping Strategy Yields Substantial Cost Reduction
Ann: Revised Shipping Strategy Yields Substantial Cost Reduction, page-178
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add E25 (ASX) to my watchlist
(20min delay)
|
|||||
Last
29.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.77M |
Open | High | Low | Value | Volume |
29.0¢ | 29.5¢ | 29.0¢ | $6.563K | 22.63K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1136 | 29.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.0¢ | 34203 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 179913 | 0.285 |
2 | 44909 | 0.280 |
1 | 10000 | 0.275 |
1 | 40000 | 0.270 |
1 | 1905 | 0.265 |
Price($) | Vol. | No. |
---|---|---|
0.300 | 34203 | 2 |
0.310 | 59584 | 3 |
0.325 | 5000 | 1 |
0.335 | 61981 | 2 |
0.340 | 121075 | 3 |
Last trade - 15.56pm 01/11/2024 (20 minute delay) ? |
Featured News
E25 (ASX) Chart |