It really depends on hw fast they can jack down the legs & pin them to the seafloor. After that there's some a bit of time spent on Safety checks, flying back the Personnel etc. The support vessel can bring in the large dia conductor pipes to punch thro' the mudline to 120m or so. All that is relatively safer part of drilling.
They could release a basic sort of update once they have a depth to report OR we can always come back next week when there's more progress made with the cementing of the 13" casing. Week-2 Jan is my estimate when they should have drilled it all out on a trouble free basis.
Buffalo-5 is the nearest well, so will b interesting to see where the Elang formation comes in at B-10. GLTA...
- Forums
- ASX - By Stock
- CVN
- Ann: Rig Mobilised for Buffalo-10
Ann: Rig Mobilised for Buffalo-10, page-8
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
19.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $348.8M |
Open | High | Low | Value | Volume |
19.5¢ | 20.0¢ | 19.5¢ | $80.01K | 402.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
20 | 1576649 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.0¢ | 319098 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
20 | 1576649 | 0.195 |
19 | 1292005 | 0.190 |
16 | 2255955 | 0.185 |
8 | 831672 | 0.180 |
6 | 382022 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.200 | 247598 | 6 |
0.205 | 720721 | 11 |
0.210 | 565036 | 13 |
0.215 | 231747 | 6 |
0.220 | 930392 | 18 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |