Mate I think helium percentage is half the story the other half is the raw gas flow.
GGE is hoping for as much as 20mmcf or 20,000mcf per day of raw gas flow at 1% so 200mcf/d of helium.
I think bnl wells are like 8mcf/d of helium so 25 wells needed to match one potential GGE well if at 200mcf/day of helium if that is accurate. eg 412mcf/d raw gas x 1.98% = 8.16mcf/d of helium etc..
- Forums
- ASX - By Stock
- Ann: Rig Mobilised for Jesse-2 Helium Well
Mate I think helium percentage is half the story the other half...
-
-
- There are more pages in this discussion • 66 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGE (ASX) to my watchlist
|
|||||
Last
0.6¢ |
Change
-0.001(14.3%) |
Mkt cap ! $12.57M |
Open | High | Low | Value | Volume |
0.7¢ | 0.7¢ | 0.6¢ | $1.295K | 214.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 11521972 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 1405540 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 11521972 | 0.005 |
19 | 13065309 | 0.004 |
5 | 3570009 | 0.003 |
8 | 5966112 | 0.002 |
6 | 7900000 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 1405540 | 7 |
0.008 | 3553177 | 9 |
0.009 | 2187500 | 8 |
0.010 | 345653 | 3 |
0.011 | 100000 | 1 |
Last trade - 12.48pm 09/07/2024 (20 minute delay) ? |
Featured News
GGE (ASX) Chart |