NHE 6.56% 5.7¢ noble helium limited

Ann: Rig up underway at Mbelele-1, North Rukwa Project, page-28

  1. 243 Posts.
    lightbulb Created with Sketch. 28
    It's just that spud was supposed to be in Q3, it is now Q4, obviously there can be delays as the drill site is in a remote part of Lake Rukwa, the roads and infrastructure won't be as developed as in Dar.
 
watchlist Created with Sketch. Add NHE (ASX) to my watchlist
(20min delay)
Last
5.7¢
Change
-0.004(6.56%)
Mkt cap ! $27.06M
Open High Low Value Volume
5.9¢ 6.0¢ 5.7¢ $33.75K 573.1K

Buyers (Bids)

No. Vol. Price($)
1 89285 5.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.0¢ 12845 1
View Market Depth
Last trade - 13.46pm 03/06/2024 (20 minute delay) ?
Last
5.7¢
  Change
-0.004 ( 1.72 %)
Open High Low Volume
6.0¢ 6.0¢ 5.7¢ 80637
Last updated 15.11pm 03/06/2024 ?
NHE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.