He1 stuffed up their first drills, poor location selection from inadequate mapping and the drill rig wasn't suited to the geology and the conduct piping wasn't long enough. Hence why they are re drilling albeit a slightly different location and better gear and mapping. NHE drilling like pros
- Forums
- ASX - By Stock
- NHE
- Ann: Rig up underway at Mbelele-1, North Rukwa Project
Ann: Rig up underway at Mbelele-1, North Rukwa Project, page-14
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NHE (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.2¢ |
Change
-0.001(1.37%) |
Mkt cap ! $34.18M |
Open | High | Low | Value | Volume |
7.4¢ | 7.5¢ | 7.0¢ | $40.77K | 565.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 714 | 7.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.2¢ | 75707 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 714 | 0.070 |
2 | 63492 | 0.069 |
3 | 27352 | 0.068 |
4 | 80768 | 0.067 |
1 | 50000 | 0.066 |
Price($) | Vol. | No. |
---|---|---|
0.072 | 75707 | 2 |
0.074 | 47000 | 1 |
0.076 | 10750 | 1 |
0.077 | 12987 | 1 |
0.080 | 210774 | 2 |
Last trade - 16.10pm 21/05/2024 (20 minute delay) ? |
|
|||||
Last
7.0¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
7.4¢ | 7.4¢ | 7.0¢ | 117887 | ||
Last updated 15.24pm 21/05/2024 ? |
Featured News
NHE (ASX) Chart |
The Watchlist
ATC
ALTECH BATTERIES LTD
Martin Stein, CFO
Martin Stein
CFO
Previous Video
Next Video
SPONSORED BY The Market Online