Commissioning is not functional testing. It is a systematic process. The team are not currently trying to push through the 2000tpa output, but are testing all aspects of the process to make sure that when we do increase it to maximum output, nothing goes wrong.
The ramp up will occur swiftly once commissioning is complete, we're in good hands here IMO.
- Forums
- ASX - By Stock
- Ann: Rincon 2,000tpa Li2CO3 Operations Update
Commissioning is not functional testing. It is a systematic...
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $55.32M |
Open | High | Low | Value | Volume |
3.9¢ | 4.0¢ | 3.8¢ | $131.9K | 3.384M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 872154 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 990329 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 872154 | 0.038 |
5 | 730581 | 0.037 |
25 | 2570708 | 0.036 |
25 | 2584608 | 0.035 |
6 | 1226910 | 0.034 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 990329 | 8 |
0.041 | 670500 | 6 |
0.042 | 998817 | 10 |
0.043 | 1577500 | 3 |
0.044 | 1316726 | 8 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |