Interesting point. If this is the case, then there might be some behind the scenes happening. Traditionally when you get the designs etc done there’s normally a warranty BG of some description. Which would mean that could still be pulled, but it’s only 5% of the contract price (normally)
I wonder if there is a design issue, in which case someone else would need to foot the bill probably under their PI cover. But that could also mean we are a further 12 months away from nameplate and resolution - of which there’s probably no Consequential Loss in the contract, so it’d become another waiting game.
I just hope they can get this working. It reminds of an ERP change over - The last 5% of the project takes as long as the first 95%….
- Forums
- ASX - By Stock
- AGY
- Ann: Rincon Lithium Project - Progress Update
Ann: Rincon Lithium Project - Progress Update, page-88
-
- There are more pages in this discussion • 109 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
-0.002(3.49%) |
Mkt cap ! $62.60M |
Open | High | Low | Value | Volume |
4.1¢ | 4.3¢ | 4.1¢ | $13.62K | 325.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1399722 | 4.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 171766 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 1399722 | 0.041 |
22 | 2548976 | 0.040 |
11 | 2999266 | 0.039 |
14 | 674020 | 0.038 |
6 | 931081 | 0.037 |
Price($) | Vol. | No. |
---|---|---|
0.042 | 171766 | 3 |
0.043 | 880641 | 5 |
0.044 | 520342 | 4 |
0.045 | 115909 | 4 |
0.046 | 200000 | 1 |
Last trade - 15.46pm 17/09/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |