AGY 41.2% 4.8¢ argosy minerals limited

Ann: Rincon Lithium Project - Progress Update, page-105

  1. 2,774 Posts.
    lightbulb Created with Sketch. 1316
    "Other work has been conducted to repair the standby primary cooling station to ensure concentrated brine is cooled to required temperatures for primary waste solids precipitation, and optimising the magnesium hydroxide re-pulping station to improve reliability in the secondary stage of magnesium hydroxide solids filtration to increase lithium recovery and process efficiency."

    Not long now? How do you gather that from the announcement?

    Also why did you leave out that they need to repair the primary cooling station, as well as optimise the re-pulping station? They say work has been conducted, but don't specify it's been completed or what is required. So we don't know the extent of the repairs needed, and don't know how long optimisation will take on the re-pulping station - it could take just as long as it's taken to optimise the filtration circuit (which still isn't completed yet).

    Can we stop being bias and include all the information we have, instead of cherry picking to tell half the story?
 
watchlist Created with Sketch. Add AGY (ASX) to my watchlist
(20min delay)
Last
4.8¢
Change
0.014(41.2%)
Mkt cap ! $69.88M
Open High Low Value Volume
3.7¢ 5.1¢ 3.6¢ $2.325M 53.80M

Buyers (Bids)

No. Vol. Price($)
4 708717 4.8¢
 

Sellers (Offers)

Price($) Vol. No.
4.9¢ 280000 1
View Market Depth
Last trade - 16.10pm 26/07/2024 (20 minute delay) ?
AGY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.