AGY 0.00% 12.5¢ argosy minerals limited

"Other work has been conducted to repair the standby primary...

  1. 2,508 Posts.
    lightbulb Created with Sketch. 1125
    "Other work has been conducted to repair the standby primary cooling station to ensure concentrated brine is cooled to required temperatures for primary waste solids precipitation, and optimising the magnesium hydroxide re-pulping station to improve reliability in the secondary stage of magnesium hydroxide solids filtration to increase lithium recovery and process efficiency."

    Not long now? How do you gather that from the announcement?

    Also why did you leave out that they need to repair the primary cooling station, as well as optimise the re-pulping station? They say work has been conducted, but don't specify it's been completed or what is required. So we don't know the extent of the repairs needed, and don't know how long optimisation will take on the re-pulping station - it could take just as long as it's taken to optimise the filtration circuit (which still isn't completed yet).

    Can we stop being bias and include all the information we have, instead of cherry picking to tell half the story?
 
watchlist Created with Sketch. Add AGY (ASX) to my watchlist
(20min delay)
Last
12.5¢
Change
0.000(0.00%)
Mkt cap ! $175.5M
Open High Low Value Volume
12.5¢ 13.0¢ 12.5¢ $65.55K 517.0K

Buyers (Bids)

No. Vol. Price($)
36 903297 12.5¢
 

Sellers (Offers)

Price($) Vol. No.
13.0¢ 382141 21
View Market Depth
Last trade - 13.28pm 03/05/2024 (20 minute delay) ?
Last
12.5¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
12.8¢ 12.8¢ 12.5¢ 609802
Last updated 13.53pm 03/05/2024 ?
AGY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.