Can you clarify the difference for us between 'reported OPEX' and 'projected OPEX', and then maybe add, Olaroz is significantly more profitable per tonne than Rincon, based on nothing more than their OPEX not increasing before AGY stage 3 is completed.
The last reportedOPEX from Olaroz was $6088 per tonne, whereas AGY have projected OPEX of US$7500 for Rincon Stage 3. That makes Olaroz significantly more profitable per tonne than Rincon, based on nothing more than OPEX savings, even though the majority of their production is lowly tech grade.
- Forums
- ASX - By Stock
- Ann: Rincon Lithium Project - Progress Update
Can you clarify the difference for us between 'reported OPEX'...
-
-
- There are more pages in this discussion • 160 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
0.001(2.70%) |
Mkt cap ! $55.32M |
Open | High | Low | Value | Volume |
3.7¢ | 3.9¢ | 3.7¢ | $81.36K | 2.169M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 545770 | 3.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.8¢ | 15087 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 259049 | 0.039 |
1 | 50000 | 0.038 |
4 | 540500 | 0.037 |
23 | 2482708 | 0.036 |
27 | 2679749 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.038 | 96168 | 2 |
0.039 | 1426254 | 8 |
0.040 | 715842 | 8 |
0.041 | 642500 | 6 |
0.042 | 1035817 | 10 |
Last trade - 16.10pm 03/10/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |