Do you think they'll have all the engineering works completed and EPCM contractors sourced and arranged for works before they require a cap raise this year?
I think we've seen enough of the same patterns over and over again that their expectation of the strategic partnership will be moved again, from 'on receipt of 10ktpa approvals' to 'in line with engineering works and EPCM contractor award'. I can already see the next 'expectation' will be on upgraded feasibility/DFS.
If they had the ability to plan ahead, this would be completed sooner rather than later, as blind Freddy can see it will be a requirement eventually.
- Forums
- ASX - By Stock
- Ann: Rincon Lithium Project - Progress Update
Do you think they'll have all the engineering works completed...
- There are more pages in this discussion • 200 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $179.0M |
Open | High | Low | Value | Volume |
13.0¢ | 13.0¢ | 12.5¢ | $47.33K | 371.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 836538 | 12.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.0¢ | 247383 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
22 | 836538 | 0.125 |
31 | 1054504 | 0.120 |
15 | 619369 | 0.115 |
13 | 674049 | 0.110 |
10 | 1094619 | 0.105 |
Price($) | Vol. | No. |
---|---|---|
0.130 | 247383 | 12 |
0.135 | 526288 | 14 |
0.140 | 703906 | 12 |
0.145 | 1007650 | 10 |
0.150 | 785694 | 17 |
Last trade - 15.21pm 02/05/2024 (20 minute delay) ? |
|
|||||
Last
12.5¢ |
  |
Change
0.000 ( 3.70 %) |
|||
Open | High | Low | Volume | ||
12.5¢ | 13.0¢ | 12.5¢ | 362785 | ||
Last updated 15.39pm 02/05/2024 ? |
Featured News
AGY (ASX) Chart |
The Watchlist
RDN
RAIDEN RESOURCES LIMITED
Dusko Ljubojevic, MD
Dusko Ljubojevic
MD
SPONSORED BY The Market Online