Seriously? What about Orocobre?
ORE's site works at Olaroz began on 21 November 2012. In less than four years, they reached a production rate of approximately 3,000 tonnes per quarter (12,000 tonnes per annum). Conversely, AGY commenced site works at Rincon on 18 November 2016. After over five years, their quarterly production stands at around 30 tonnes. This starkly contrasts with ORE's rapid achievement of 3,000 tonnes per quarter in less than four years. AGY's accomplishment represents only 1% of what ORE achieved in a similar timeframe.
Referring to AGY's progress as "fast tracked" should now be a source of embarrassment.
- Forums
- ASX - By Stock
- Ann: Rincon Lithium Project - Progress Update
Seriously? What about Orocobre?ORE's site works at Olaroz began...
- There are more pages in this discussion • 195 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.5¢ |
Change
0.005(3.85%) |
Mkt cap ! $182.5M |
Open | High | Low | Value | Volume |
13.0¢ | 13.5¢ | 13.0¢ | $31.03K | 236.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
24 | 1120142 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.5¢ | 490037 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
24 | 1120142 | 0.130 |
26 | 1022492 | 0.125 |
41 | 1130704 | 0.120 |
17 | 1486000 | 0.115 |
12 | 781953 | 0.110 |
Price($) | Vol. | No. |
---|---|---|
0.135 | 490219 | 18 |
0.140 | 1696242 | 9 |
0.145 | 2124364 | 15 |
0.150 | 1101297 | 21 |
0.155 | 419550 | 6 |
Last trade - 12.55pm 28/05/2024 (20 minute delay) ? |
|
|||||
Last
13.5¢ |
  |
Change
0.005 ( 1.96 %) |
|||
Open | High | Low | Volume | ||
13.3¢ | 13.5¢ | 13.0¢ | 346742 | ||
Last updated 12.16pm 28/05/2024 ? |
Featured News
AGY (ASX) Chart |