AGY 4.08% 4.7¢ argosy minerals limited

Ann: Rincon Lithium Project Update, page-265

  1. 10,595 Posts.
    lightbulb Created with Sketch. 2095
    A few different mini pilot plants using different tech that costs around 250k to 350k each to build and set up on site, should have been used over 1 to 2 years to identify a economical way to extract the Lithium from the brines, and only after a few years of lab tests were done, when this did not happen over the past 7 years, it was a clear warning sign of what was to come, and the question is why was these procedures not followed before going into production with a larger plant.
    There was a lot of jumping into something before doing the long hard work with testing the brines first, something that I have always been very critical of and why I have only stayed invested in one lithium brine stock that has been doing what I want to see happen first before making the final decision to build a production plant.
    Slow and steady wins the race, AGY just jumped to many procedures I would have followed early on, they just went to fast.
 
watchlist Created with Sketch. Add AGY (ASX) to my watchlist
(20min delay)
Last
4.7¢
Change
-0.002(4.08%)
Mkt cap ! $68.42M
Open High Low Value Volume
5.0¢ 5.3¢ 4.6¢ $407.5K 8.030M

Buyers (Bids)

No. Vol. Price($)
2 411506 4.7¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 86000 1
View Market Depth
Last trade - 16.10pm 28/08/2024 (20 minute delay) ?
AGY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.