I'm not sure I'd describe it as luck; I think misfortune is more appropriate. After all, they've been developing the engineering for Stage 3 based on Stage 2, and now they've realised that Stage 2 doesn't work, so they're back to the drawing board for the Stage 3 engineering.
That's a lot of wasted time, money and effort over the last 12 months or so trying to "fast track" their development, and buggering it up (again).
Measure twice, cut once comes to mind......
- Forums
- ASX - By Stock
- AGY
- Ann: Rincon Lithium Project Update
Ann: Rincon Lithium Project Update, page-502
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
|
|||||
Last
4.4¢ |
Change
-0.004(8.33%) |
Mkt cap ! $64.06M |
Open | High | Low | Value | Volume |
5.0¢ | 5.1¢ | 4.3¢ | $706.9K | 15.35M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 236588 | 4.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.5¢ | 414221 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 236588 | 0.044 |
8 | 1574100 | 0.043 |
7 | 418560 | 0.042 |
11 | 872075 | 0.041 |
21 | 1264035 | 0.040 |
Price($) | Vol. | No. |
---|---|---|
0.045 | 414221 | 2 |
0.046 | 208518 | 3 |
0.047 | 50000 | 1 |
0.048 | 956789 | 6 |
0.049 | 742843 | 5 |
Last trade - 16.10pm 29/07/2024 (20 minute delay) ? |
Featured News
NVA
Nova locks in NASDAQ US market listing at a value of only US$3.3M as ASX gets quieter and quieter
MND
Monadelphous inks $200M contract with Woodside to help build Pluto LNG – but will it make Scarborough cheaper?
AGY (ASX) Chart |