SVM 0.85% 58.0¢ sovereign metals limited

One of the major risks with SVM is the transport infrastructure....

  1. 9 Posts.
    One of the major risks with SVM is the transport infrastructure. They seem to play this down, however everything I have read seems to indicate that the infrastructure is poor.
    I doubt they will address this in scoping study in any more detail, therefore this risk will hang over the stock until the DFS.
 
watchlist Created with Sketch. Add SVM (ASX) to my watchlist
(20min delay)
Last
58.0¢
Change
-0.005(0.85%)
Mkt cap ! $326.5M
Open High Low Value Volume
58.5¢ 59.0¢ 58.0¢ $140.1K 239.4K

Buyers (Bids)

No. Vol. Price($)
8 103461 58.0¢
 

Sellers (Offers)

Price($) Vol. No.
59.0¢ 111565 2
View Market Depth
Last trade - 15.43pm 30/05/2024 (20 minute delay) ?
Last
58.0¢
  Change
-0.005 ( 0.00 %)
Open High Low Volume
58.5¢ 59.0¢ 58.0¢ 33245
Last updated 15.43pm 30/05/2024 ?
SVM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.