CE1 12.5% 0.9¢ calima energy limited

  1. 800 Posts.
    lightbulb Created with Sketch. 111

    So the spud date of P10 was Sept 8, and less than a week later P11 spud date occurred, and less than a week after that P12 spud date occurred.

    So if the workflow continues according to trend, then next week P11 could be producing, and a week after that P12 could be producing (as per below image).

    Also, P6, P7, and P10 are producing "significantly above the typical production curve" (as shown in above announcement), meaning that a continuation of this trend could result in P11 and P12 also producing "significantly above the typical production curve".

    In a best case scenario, we could be receiving more positive news about P11 and P12 within the next week or two, and in a best case scenario where all new wells exceed the typical production curve, we could end up exceeding the stated target of ~4,000 barrels per day just by completing these 3 new wells.


    https://hotcopper.com.au/data/attachments/5630/5630478-d35af8aec5cad138f05d8d838a7aa671.jpg


 
watchlist Created with Sketch. Add CE1 (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.001(12.5%)
Mkt cap ! $5.701M
Open High Low Value Volume
0.9¢ 1.0¢ 0.9¢ $120.4K 13.19M

Buyers (Bids)

No. Vol. Price($)
7 4959827 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 2350353 1
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
CE1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.