agreed. the bridges are not massive and are made of big logs for the most part. See photo from last road update. Bridges is what slow it down the rest is fairly quick-moving, so shouldn't be too much longer. As mentioned the supply is back up and weather permitting. either way, the additional manpower to bring forward coal haulage is better.
- Forums
- ASX - By Stock
- Ann: Road Construction Update for BBM Project
agreed. the bridges are not massive and are made of big logs for...
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CKA (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.0¢ |
Change
0.010(10.0%) |
Mkt cap ! $118.6M |
Open | High | Low | Value | Volume |
9.9¢ | 11.0¢ | 9.9¢ | $24.65K | 235.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 210 | 10.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.0¢ | 424999 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 210 | 0.105 |
4 | 243988 | 0.100 |
1 | 120000 | 0.099 |
1 | 5154 | 0.097 |
1 | 7000 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.110 | 424999 | 6 |
0.115 | 577525 | 6 |
0.120 | 898055 | 7 |
0.125 | 300000 | 2 |
0.130 | 120000 | 1 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
10.5¢ |
  |
Change
0.010 ( 5.00 %) |
|||
Open | High | Low | Volume | ||
9.9¢ | 10.5¢ | 9.9¢ | 78317 | ||
Last updated 15.49pm 03/05/2024 ? |
Featured News
CKA (ASX) Chart |