Only counted 4 trucks! A start by all means but 4 x 30t trucks doing let’s say two round trips will only deiliver 240t/day. Squeeze in a third trip and it grows to 360t. That’s somewhere around the 1500-2500t/week mark; well short of the 10,000t/week needed to just deliver 500,000tpa let alone the nameplate 2mtpa we are heading for.
Great to see them delivering; another milestone (albeit late) but really need a minimum of 15 trucks driving 3 trips/day, 7 days a week to get anywhere close to 10,000t/week.
Anyway, now SGE will be seeing a stockpile grow, maybe they will be more interested in diverting a barge our way! Unfortunately, without more trucks it will take time to big a decent stockpile.
May be a week or two before the first barge at this rate. Sad to see the SP down at 15c again!
SJ, any intel from your friends? Or is it a case of sit back and continue to be patient?
- Forums
- ASX - By Stock
- Ann: Road Hauling of Coal Successfully Commissioned at BBM
Only counted 4 trucks! A start by all means but 4 x 30t trucks...
-
- There are more pages in this discussion • 118 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CKA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.1¢ |
Change
-0.003(3.19%) |
Mkt cap ! $98.18M |
Open | High | Low | Value | Volume |
9.1¢ | 9.6¢ | 9.1¢ | $10.28K | 109.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 40827 | 9.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.5¢ | 340000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 40827 | 0.091 |
2 | 11809 | 0.090 |
1 | 30000 | 0.086 |
4 | 702044 | 0.085 |
2 | 41904 | 0.084 |
Price($) | Vol. | No. |
---|---|---|
0.097 | 70000 | 1 |
0.098 | 41116 | 1 |
0.100 | 20000 | 2 |
0.105 | 40750 | 1 |
0.110 | 220000 | 2 |
Last trade - 15.59pm 02/08/2024 (20 minute delay) ? |
Featured News
CKA (ASX) Chart |