    Would it be right to say:
    - The current level of ore sorters is matched to (or limited by) the M&I resources size, and 6mtpa plant size.
    - If M&I resources was increased significantly (eg. 3.4Moz up to 5Moz), the company has the option to:
    - Increase mill throughput.
    - Or invest in more ore sorters, and dial up the ore sorters to output a higher grade, but still resulting in the same 6mtpa mill throughput?
    - Ore sorting seems to be relatively cheap vs other costs, so I guess the ore sorting is mainly limited by the current level of M&I resources?