@NovaMInerals2
Would it be right to say:
- The current level of ore sorters is matched to (or limited by) the M&I resources size, and 6mtpa plant size.
- If M&I resources was increased significantly (eg. 3.4Moz up to 5Moz), the company has the option to:
- Increase mill throughput.
- Or invest in more ore sorters, and dial up the ore sorters to output a higher grade, but still resulting in the same 6mtpa mill throughput?
- Ore sorting seems to be relatively cheap vs other costs, so I guess the ore sorting is mainly limited by the current level of M&I resources?
- Forums
- ASX - By Stock
- Ann: Robust Phase 2 Scoping Study for the Estelle Gold Project
@NovaMInerals2Would it be right to say:- The current level of...
-
-
- There are more pages in this discussion • 54 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
19.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $40.86M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 202552 | 18.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
19.0¢ | 135778 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 202552 | 0.180 |
4 | 40000 | 0.175 |
5 | 149650 | 0.170 |
1 | 3125 | 0.160 |
3 | 134500 | 0.155 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 135778 | 5 |
0.195 | 619753 | 1 |
0.200 | 17400 | 3 |
0.210 | 40216 | 4 |
0.220 | 6000 | 1 |
Last trade - 10.09am 26/06/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |
Day chart unavailable