Hi, if you don't increase the plant size you can only put the 26MT through the plant over the 11 years. So you would be increasing the LOM. This additional cashflow after yr 11 won't affect the NPV as much as in the early years.
To mine 45MT over the 11 years you would need to (roughly) double production and CAPEX (although this would be staged so paid for by free cash flow).
What the PEA highlights is there is so much opportunity leading into the DFS to increase total resource (over and above the 45MT), increase annual production capacity and increase life of mine. All of these will result in a much larger NPV.
Cheers
- Forums
- ASX - By Stock
- Ann: Robust Results for Colina Lithium Project PEA
Hi, if you don't increase the plant size you can only put the...
- There are more pages in this discussion • 210 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LRS (ASX) to my watchlist
(20min delay)
|
|||||
Last
26.0¢ |
Change
0.005(1.96%) |
Mkt cap ! $728.8M |
Open | High | Low | Value | Volume |
25.5¢ | 26.5¢ | 25.0¢ | $1.745M | 6.766M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 125502 | 25.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
26.0¢ | 930717 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 125502 | 0.255 |
3 | 26900 | 0.250 |
7 | 159281 | 0.245 |
6 | 278599 | 0.240 |
6 | 159592 | 0.235 |
Price($) | Vol. | No. |
---|---|---|
0.260 | 224539 | 8 |
0.265 | 1250759 | 4 |
0.270 | 638843 | 14 |
0.275 | 685754 | 17 |
0.280 | 2192727 | 20 |
Last trade - 16.10pm 10/05/2024 (20 minute delay) ? |
|
|||||
Last
25.0¢ |
  |
Change
0.005 ( 1.96 %) |
|||
Open | High | Low | Volume | ||
25.5¢ | 26.5¢ | 25.0¢ | 2995160 | ||
Last updated 16.02pm 10/05/2024 ? |
Featured News
LRS (ASX) Chart |