re: Ann: Rosewood Plantation 21H No.1 Drillin... With the new drill assembly one would think the horizontal leg could nearly be completed.
One would expect more fractures to have been drilled through.From what I have gleaned from researching is great care is needed to keep the drill tracking through the fractured areas.
Good luck -----Cham