re: Ann: Rosewood Plantation 21H No.1 Drillin... 2000 feet of lateral still to be drilled. Drill bit replaced and new motor on the assembly needed. More fractures expected.
- Forums
- ASX - By Stock
- PYM
- Ann: Rosewood Plantation 21H No.1 Drilling Update
Ann: Rosewood Plantation 21H No.1 Drilling Update, page-2
-
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)