re: Ann: Rosewood Plantation 21H No.1 Drillin... after a long wait, PYM are only 350m away from total depth and they are already getting oil and gas flowing unassisted to surface... exciting times ahead :)
I wouldnt want to be sitting on the sidelines with regular updates and flow rates to come shortly.
Must be time for some new broker reports and a re-rate.
Go Pryme !