yes, assuming that the sensitive analysis is correct, I calculated before that just adding RPM to Korbel indicated portion could triple the g/t.
Now, they will expand the indicated portion in Korbel to maybe 5 Moz or so (possibly at same grade). But they also may have closer to 2 Moz at 2 g/t. Let’s assume for arguments sake:
Korbel 5 Moz @0.4 g/t
RPM 2Moz @2 g/t
Average g/t 0.85
Every 10% grade up is 400 M added to NPV.
Appr. 100% added to grade = 4 Bln added to NPV.
I know this looks incredible and too good to be true. Can someone shoot any holes in my calculations?
Of course I am assuming constant prices which is wrong and will affect numbers. NVA states they will only need to add 20M in Capex for RPM transportation, which I take at face value.
- Forums
- ASX - By Stock
- NVA
- Ann: RPM Gold Deposit Operational Update
Ann: RPM Gold Deposit Operational Update, page-44
-
- There are more pages in this discussion • 326 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.5¢ |
Change
-0.005(2.78%) |
Mkt cap ! $42.62M |
Open | High | Low | Value | Volume |
18.0¢ | 18.0¢ | 17.0¢ | $29.65K | 167.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2500 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 21990 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2500 | 0.165 |
4 | 101163 | 0.155 |
7 | 165467 | 0.150 |
3 | 141378 | 0.145 |
5 | 555000 | 0.140 |
Price($) | Vol. | No. |
---|---|---|
0.180 | 21990 | 1 |
0.190 | 26896 | 2 |
0.195 | 4995 | 1 |
0.200 | 43461 | 2 |
0.220 | 4500 | 1 |
Last trade - 15.56pm 18/09/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |