yes, assuming that the sensitive analysis is correct, I calculated before that just adding RPM to Korbel indicated portion could triple the g/t.
Now, they will expand the indicated portion in Korbel to maybe 5 Moz or so (possibly at same grade). But they also may have closer to 2 Moz at 2 g/t. Let’s assume for arguments sake:
Korbel 5 Moz @0.4 g/t
RPM 2Moz @2 g/t
Average g/t 0.85
Every 10% grade up is 400 M added to NPV.
Appr. 100% added to grade = 4 Bln added to NPV.
I know this looks incredible and too good to be true. Can someone shoot any holes in my calculations?
Of course I am assuming constant prices which is wrong and will affect numbers. NVA states they will only need to add 20M in Capex for RPM transportation, which I take at face value.
- Forums
- ASX - By Stock
- Ann: RPM Gold Deposit Operational Update
yes, assuming that the sensitive analysis is correct, I...
-
- There are more pages in this discussion • 326 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
|
|||||
Last
22.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $47.31M |
Open | High | Low | Value | Volume |
19.5¢ | 22.0¢ | 18.5¢ | $36.38K | 190.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 4772 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 688 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 4772 | 0.195 |
2 | 109778 | 0.190 |
2 | 82844 | 0.185 |
6 | 88001 | 0.180 |
7 | 158999 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 688 | 1 |
0.230 | 2238 | 1 |
0.235 | 6547 | 1 |
0.240 | 31800 | 3 |
0.245 | 19999 | 1 |
Last trade - 16.10pm 11/07/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |