ADT 0.27% $3.72 adriatic metals plc

Ann: Rupice Ore Reserves Upgrade, page-44

  1. 152 Posts.
    lightbulb Created with Sketch. 130
    The SeeNews article was written by someone who got a number of things wrong. The start of "mining" must probably be read "processing" as mine production has started / can start tomorrow with a number of stopes developed to a production-ready state. The Vares Silver Project is also not an "open cut" mine and the barite is at this stage not an economical product. Strange that Paul disclosed this important news to this outfit instead of reporting it widely to more knowledgeable agencies followed by the broader market.
 
watchlist Created with Sketch. Add ADT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.