Highlights:
• Exceptionally high-grade polymetallic ore intersected on 620 Level in Far West UG mine at
Red River’s Thalanga Operation in Northern Queensland
• Cut 26 in the 620 Level Western Ore Drive intersected massive and semi massive sulphide ore
- Face grade of 4.7m @ 4.9% Cu, 6.2% Pb, 22.0% Zn, 168 g/t Ag & 1.0 g/t Au (48.3% Zn Eq.)
• Cut 36 in the 620 Level Eastern Ore Drive intersected massive and semi massive sulphide ore
- Face grade of 3.1m @ 3.5% Cu, 6.4% Pb, 12.7% Zn, 99 g/t Ag & 0.6 g/t Au (33.0% Zn Eq.)
• Both Cuts have been recently mined - Cut 26 (20 October 2020) and Cut 36 (30 October 2020)
• Consistent production from Far West is driving metal production, with Red River achieving
record quarterly copper concentrate production in Q1FY21 of 4,073 dry metric tonnes
This is looking better by the day?
High grades right, holy s--t, how profitable will RVR be now?
- Forums
- ASX - By Stock
- Ann: RVR mines exceptional high-grade ore at Far West
Highlights:• Exceptionally high-grade polymetallic ore...
-
-
- There are more pages in this discussion • 39 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)