I see what you are saying, however maybe the increase will be more obvious in the next quarter. I don't think such a job would be completed quickly at the start of the quarter. That information is not available to us.
The other thought is what would the output be without the maintenance, usually oil production slows down over time.
- Forums
- ASX - By Stock
- SGC
- Ann: Sacgasco to Advance Borba Hydrogen Project
Ann: Sacgasco to Advance Borba Hydrogen Project, page-102
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
-0.001(16.7%) |
Mkt cap ! $3.898M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.5¢ | $16.82K | 2.83M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 5041044 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 400000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 5041044 | 0.005 |
5 | 11304279 | 0.004 |
4 | 1274998 | 0.003 |
1 | 600000 | 0.002 |
1 | 500500 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 400000 | 1 |
0.007 | 1767472 | 4 |
0.008 | 900000 | 1 |
0.009 | 2391876 | 4 |
0.010 | 966562 | 1 |
Last trade - 16.10pm 05/06/2024 (20 minute delay) ? |
|
|||||
Last
0.6¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.6¢ | 0.6¢ | 0.6¢ | 1102840 | ||
Last updated 13.54pm 05/06/2024 ? |
Featured News
SGC (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non-Executive Director
Simon Kidston
Non-Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online