LNR 0.00% 0.3¢ lanthanein resources ltd

Ann: Saki Initial Results Include 29.1g/t Gold in Rock Sample, page-34

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,710 Posts.
    lightbulb Created with Sketch. 603
    I'm guessing they would have the results and are finalizing the report. I think people forget the assay report coming from the Labs isnt a detailed announcement. The results need to be analyzed in the context of the previous result and the geology of the terrain. They also need to have the full analytical and site preparation reports and sample collection steps catalogued for the JORC compliance. Then once the report is written it would be checked by legal before being signed of by the board and then submitted to the ASX for them to check before posting. As the assay results were expected early August I would allow an extra two weeks for run over time and two weeks for analysis, compliance and legal so I would be expecting them this week,

    AMOO DYOR

    GD
 
watchlist Created with Sketch. Add LNR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.