Meh
Highlights
• First drill hole for planned production well completed to a depth of 150 metres
• Earthwork for second drill pad and existing access road improvement undertaken to facilitate drill rig mobilization completed
• Approximately 3,000 hectares of topographic survey to be utilized in future evaporation pond layout and design now completed
• Sal de Vida Project previously permitted through to completion of construction, now granted renewal of environmental permit from Catamarca Province
• Planning commenced for relocation of former pilot plant facilities to new camp location
- Forums
- ASX - By Stock
- GXY
- Ann: Sal De Vida Update
Ann: Sal De Vida Update, page-4
-
- There are more pages in this discussion • 74 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GXY (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online