Meh
Highlights
• First drill hole for planned production well completed to a depth of 150 metres
• Earthwork for second drill pad and existing access road improvement undertaken to facilitate drill rig mobilization completed
• Approximately 3,000 hectares of topographic survey to be utilized in future evaporation pond layout and design now completed
• Sal de Vida Project previously permitted through to completion of construction, now granted renewal of environmental permit from Catamarca Province
• Planning commenced for relocation of former pilot plant facilities to new camp location
- Forums
- ASX - By Stock
- GXY
- Ann: Sal De Vida Update
Ann: Sal De Vida Update, page-4
-
- There are more pages in this discussion • 74 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)