PNN 3.70% 14.0¢ power minerals limited

Ann: Salta Brine Blending Final Results, page-42

  1. 20,020 Posts.
    lightbulb Created with Sketch. 870
    One would assume the processing plant will be at one of the salars. I'm assuming here that an approximately 35km pipeline for the brines to be blended with each other would be very expensive.

    Here in Australia a water pipeline costs about $9M per km, so since things are cheaper in Argentina, let's say $5M per km, so $5M x 35km = $175M AUD or approx. $120M USD, on top of all other costs. I guess that could be do-able.

    Having said that, trucking the brine would be a cheaper and more flexible option. But it will mean costs per tonne of LCE for PNN won't be in the lowest percentiles, like other lithium brine operations in the area, they will be higher.
 
watchlist Created with Sketch. Add PNN (ASX) to my watchlist
(20min delay)
Last
14.0¢
Change
0.005(3.70%)
Mkt cap ! $12.96M
Open High Low Value Volume
12.5¢ 14.0¢ 12.5¢ $3.084K 22.44K

Buyers (Bids)

No. Vol. Price($)
1 16159 12.5¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 69517 4
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
13.0¢
  Change
0.005 ( 4.00 %)
Open High Low Volume
12.5¢ 13.5¢ 12.5¢ 60500
Last updated 14.19pm 14/06/2024 ?
PNN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.